2001 - today
- 2018
Start of renovation of Klinik Beau-Site to optimise the use of space in order to strengthen medical specialties such as cardiac, vascular, pulmonary and abdominal medicine and to pool outpatient processes.
- 2015
Klinik Beau-Site celebrates its 70th anniversary. The video for the 70th anniversary of the hospital presents the most important milestones:
- 2014
Klinik Beau-Site is the only hospital besides Inselspital to be awarded a performance mandate for major, rare abdominal surgery procedures by GDK
- 2013 / 2014
Construction of a third fully digitised heart catheter laboratory (HCL) specialising in the treatment of patients with cardiac arrhythmias
- 2011
Extension of the Intensive Care Unit (ICU), Day Hospital and Intermediate Care/Recovery Ward (IMC)
- 2011
Opening of the modern medical centre and ward block (Haus von Rodt), September
- 2009
Start of construction of a new medical centre and ward block on the hospital site. End of construction: Summer 2011.
- 2004
Restructuring of 24h Cardiac Emergency. Cooperation with the Emergency Department at Salem-Spital.
- 2002
Completion of the 27-million conversion with additionally created 2nd and 3rd basement.
1945 - 2000
- 1990
Merger with the Hirslanden Private Hospital Group
- 1986
The renovation of the entire hospital site is completed; the heart catheter laboratory and heart surgery are added
- 1982
Acquisition by the AMI Private Hospital Group
- 1965
Extension of the hospital by the building at Schänzlihalde 15
- 1945
Beau-Site, built around 1911 as a hotel, is bought by Dr. Werner Raaflaub and two other doctors and converted into a hospital.